Free Desktop Assessment:

 

Planning policy overview and  technical viability consultation looking at proximity to ground obstructions and an estimation of the wind resource.  

 

From there we offer a step by step process to gain consent for your project whilst minimising risk of loss at each stage of the development process. -Read more about our Planning and Pre Construction services.

 

Renewable Energy for Businesses, Schools, Councils and Investors, we make it as easy as 1,2,3

 

Contact our sales team today; 

 

+44 (0)203 286 2236

 

 

Send an Enquiry

 

 

 

Lease Land for Green Energy

 

Rent land for wind turbines / Lease land for wind farm

 

Do you own a farm in a windy location?

 

Are you are landowner with properties suitable for wind power generation?

 

Find out how Empowering Wind Group can earn your business a guaranteed index linked income for the next 20 years with our wind power generation Lease Option.

 

Annual rents from £18,000 in the first year per turbine  

 

Deployment of 500KW single wind turbines - Only 50m to the hub of the turbine.

 

 

Renewable Energy for Schools:

 

Renewable Energy for Schools / Wind Turbines for Schools

 

Make your school eco friendly and educate our future generations as to the importance of renewable energy sources with Empowering Wind's turnkey wind and solar power generation solutions.  

 

Enquire here to get your school's free desktop viability assessment.

 

 

 

 

 

 

WINDFLOW 500 KW WIND TURBINE

  

This Class 1 Rated 500KW dual bladed wind turbine is ideal for remote sites. Its small size and Grid friendly electrical design makes the Windflow perfect for sites in the Scottish Highlands and British Isles.

 

 

 

Windflow 500KW Class 1 Rated Wind Turbine

                                                                                                         

500KW Wind Turbine Investment Potential:  The Feed in Tariff for wind turbines of rated output between 100 - 500KW is 19.7p /KWh (Generation) + 3.1p /KWh (Export) in the first year, increasing with the rate of inflation.  

 

Technical Summary:

 

 Type

500KW Windflow

 Rotor Diameter (Twin Blade)

33.2m

Rotor Speed48 -51 RPM
Swept Area866 sqm
Hub Height30m
Cut in Wind Speed5.5 m/s
Cut out Wind Speed30 m/s
Class CertificationClass 1A
Rated Power Output at13.7 m/s

 

 Cost-Efficient

  • Modern innovative design reduces turbine costs
  • Reduced transportation and construction costs
  • No need for expensive equipment to connect to the Grid 


 Durable and robust

  • Excellent performance in strong and turbulent winds
  • IEC class 1A certification (pending)


 Easy transport, installation and connection

  • 3-5 metre wide roads, no upgrades or infrastructure typically required
  • Two-bladed rotor and nacelle installed in one easy lift
  • Synchronous generation allows cost effective connection to the grid


Two-bladed pitch teetering:


The Windflow two-bladed design uniquely allows the turbine blades to teeter on a hinge.  This teetering motion is linked to an asymmetric pitching mechanism of the turbine blades.  Uneven wind gusts are passively absorbed thus reducing the fatigue loads throughout the turbine.  This results in reductions in turbine weight and cost and an increase in turbine reliability.

Torque limiting gearbox:


With the aid of active pitch control, the turbine blades and hub deliver the gearbox with near-constant speed of rotation, via the low speed shaft.  The high speed shaft from the gearbox driving the synchronised synchronous generator requires a constant speed of rotation.  So, the small variations in hub speed (caused by potentially damaging wind gusts) are absorbed by a hydraulic pump on a second output from the gearbox.  The torque limiting gearbox is patented in several countries.

500 kW:


The 500kW Windflow turbine is a direct competitor to 3-bladed multi-mega watt turbines. On a per megawatt installed basis, the smaller, 500 kW turbine allows for easier transportation, more straight-forward installation and reduced environmental and visual impact considerations.  

Synchronous generator:


Due to the constant input from the Torque Limiting Gearbox, the Windflow turbine is able to utilise a synchronous generator, synchronised directly with the Grid without the aid of costly and unreliable power electronics.  As well as reducing costs and increasing reliability, this feature allows for easier connection.

Performance guarantees: underwritten by third party financial service provider.

 

Submit an Enquiry for further information or technical specifications.

 

Empowering Wind Group works in co-operation with leading wind turbine manufacturers to deliver 500KW wind projects on a turnkey basis, with technical availability warranties of up to 15 years and performance guarantees on sites with recorded wind data. 

 

From land acquisition, legal due diligence, council consultations and submission of the planning application to connecting the wind turbine to the Grid, Empowering Wind ensures success of your project by mitigating risks of loss at each stage of the development process.

 

 

  500KW Wind Turbines                         2.4KW - 250KW Wind Turbines         2.5MW+ Industrial / Windfarm

500KW Wind Turbines

Commercial Wind Turbines

Industrial Wind Turbines

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Home - Wind Power - Solar Power - Send your Enquiry


EmpoweringWind.co.uk 2010 Empowering Wind Group  © Copyright - All Rights Reserved.