Free Desktop Assessment:

 

Planning policy overview and  technical viability consultation looking at proximity to ground obstructions and an estimation of the wind resource.  

 

From there we offer a step by step process to gain consent for your project whilst minimising risk of loss at each stage of the development process. -Read more about our Planning and Pre Construction services.

 

Renewable Energy for Businesses, Schools, Councils and Investors, we make it as easy as 1,2,3

 

Contact our sales team today; 

 

+44 (0)203 286 2236

 

 

Send an Enquiry

 

 

 

Renewable Energy for Schools:

 

Renewable Energy for Schools / Wind Turbines for Schools

 

Make your school eco friendly and educate our future generations as to the importance of renewable energy sources with Empowering Wind's turnkey wind and solar power generation solutions.  

 

Enquire here to get your school's free desktop viability assessment.

 

 

 

 

 

Lease Land for Green Energy

 

Rent land for wind turbines / Lease land for wind farm

 

Do you own a farm in a windy location?

 

Are you are landowner with properties suitable for wind power generation?

 

Find out how Empowering Wind Group can earn your business a guaranteed index linked income for the next 20 years with our wind power generation Lease Option.

 

Annual rents from £18,000 in the first year per turbine  

 

Deployment of 500KW single wind turbines - Only 50m to the hub of the turbine.

 

500KW WIND TURBINES

  

Our primary focus as developers in the UK is on the deployment of single 500KW wind turbines at brownfield, industrial and poor grade agricultural land sites.  The 500KW wind turbines present less planning risk than the wind farm scale turbines, with a typical project turnaround timeframe of six to eight months from conept to commissioning of the wind turbine.

 

500KW Wind Turbines

                                                                                                         

500KW Wind Turbine Investment Potential:  The Feed in Tariff for wind turbines of rated output between 100 - 500KW is 19.7p /KWh (Generation) + 3.1p /KWh (Export) in the first year, increasing with the rate of inflation.  An average 500KW UK wind turbine installation yields 1,850MWh per annum.

 

Empowering Wind Group works in co-operation with leading wind turbine manufacturers to deliver 500KW wind projects on a turnkey basis, with technical availability warranties of up to 15 years and performance guarantees on sites with recorded wind data. 

 

From land acquisition, legal due diligence, council consultations and submission of the planning application to connecting the wind turbine to the Grid, Empowering Wind ensures success of your project by mitigating risks of loss at each stage of the development process.

 

Complete our  online form   with your site details for  a free no obligation desktop evaluation report with our interim energy yield calculations and approximate costs of installation.  

 

 

 

  EWT DW52 /DW54  500                      Powerwind 56 500                               Class 1 Rated  Windflow 500

EWT 500KW DW52 / DW54

PowerWind 500KW 56500 Wind Turbine

500KW Windflow Wind Turbine

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Home - Wind Power - Solar Power - Send your Enquiry


EmpoweringWind.co.uk 2010 Empowering Wind Group  © Copyright - All Rights Reserved.